Platform
Your probes. Your records. Your adviser.
$20per acre per year
Minimum 20 acres.
- Your Monday briefing is ready for your adviser to review. The Monday list follows a season of your own SWP readings, and a Thursday draft order needs our agronomist’s past orders for each block loaded into the draft’s rules. Your adviser makes the irrigation call.
- The Monday list needs a season of the farm’s own SWP readings. A farm with no readings does not get it. A farm with no readings starts with the three-day soil projection on each probe, once the probe has logged a wetting. The pump switch question runs on the dashboard of our longest-running orchard today. It needs a run record for each block and a rain record, it is weaker outside the irrigation season, and on other ground its check was too small to call.
- Connect your Sentek probes through IrriMAX Live, pump and meter data, and CIMIS weather. Other sensor platforms are connected on request: our team checks feed access and connects what we can.
What Platform includes
- Alerts worth checking: a missed set, judged against the block's own last four weeks; a block that is dry and overdue; a probe that stops reporting. The missed-set alert starts once a block has a few weeks of its own pump records (a pump switch or a per-block meter), and the dry-and-overdue alert once a block has a season of probe history.
- Stem water potential (SWP) readings are optional to start. When your adviser takes one, it is judged against its block's stress line. Every SWP reading your adviser takes sharpens the Monday list and the block’s record.
- Our crew's SWP readings and Ask an agronomist are add-ons. Talk to us.
Trial
The trial converts to the paid plan unless you cancel in writing before your free period ends.
Platform, on your existing probes: free for 90 days from when your probe data connects. Then $20 per acre per year, 20-acre minimum. The paid plan starts the day after your free period ends unless you cancel in writing before it ends. For October to December signups, the free period ends on March 31 or 90 days after your probes start sending usable data, whichever is later.
After the Platform trial converts, cancellation takes effect at the end of your current billing quarter.
Starting the Platform trial also starts our data terms. You keep ownership of your raw data. Read the data terms
