Block-level actions
Front-load a drying block
Low profile plus heat in the extended forecast: refill before the heat, not during it.
Hold a set on a full profile
Depletion tracking shows the root zone is still wet; hours-per-block guidance says wait.
Salt reading when pore-water EC climbs
Salinity read from the probe, so your adviser can make the flushing call before salt damage builds.
Send someone to a probe that stopped reporting
Sensor and flow-meter health checks flag offline equipment.
