Growing in Greater Kaweah? Water year 2026 gave every parcel 0.83 acre-feet per acre of sustainable yield plus a precipitation allocation, then 0.31 acre-feet of Tier 1 at up to $150 and 0.23 of Tier 2 at up to $250, with anything beyond at up to $500 and a cut next year. The Board can bill you on your own flowmeter instead of satellite ET if you elect it by October 1 of the water year and report every month; the election for water year 2027 was due October 1, 2026, so confirm the next election period with the GSA. On October 12, 2026 the Board set the water year 2027 penalty rates at up to $250 for Tier 1, $250 for Tier 2 and $500 beyond; the water year 2027 allocation figures were not posted as adopted as of October 21, 2026, and the next regular meeting is November 9, 2026.

Public sources checked . Confirm later changes with your GSA.

The allocation

“Sustainable Yield Allocation is 0.83 acre-feet/acre; Tier 1 Penalty Allocation is 0.31 acre-feet/acre; Tier 2 Penalty Allocation is 0.23 acre-feet/acre. The combined total for Sustainable Yield, Tier 1 and Tier 2 is 1.37 acre-feet/acre.”

The ramp-down: transitional water as a share of the average annual overdraft
70 percent40 percent20 percent2026 to 20302031 to 20352036 to 204070 percent40 percent20 percent2026 to 20302031 to 20352036 to 2040
  • Tier 1 and Tier 2 together, as a share of the 124,600 acre-foot average annual overdraft (Rule 4.03(b))
Show the numbers
Transitional water, share of the average annual overdraft
Water yearsShare
2026 to 203070 percent
2031 to 203540 percent
2036 to 204020 percent

Water year 2026 runs October 1, 2025 to September 30, 2026. The Board approved its allocations at a special meeting on October 13, 2025, in units of evapotranspiration, that is, net usage. On top of the 1.37, each parcel receives a precipitation allocation by Township-Range-Section: a 25-year rolling average that ranges from 3 inches in the western portion of the GSA to 11 inches in the eastern portion, debited before anything else.

Rule text and sources9 sources

The native figure rose from 0.62 to 0.83 for water year 2026 when the Board moved the deep percolation of precipitation into the native sustainable yield and out of the precipitation allocation: direction to staff on September 8, 2025, Fourth Amended Rules approved October 13, 2025.

Water year 2027 (from October 1, 2026): the GSA's consulting engineer sent the Board a recommendation on July 10, 2026, with the precipitation table to follow in September. The October 12, 2026 Board meeting took a status report on the allocation and set the penalty rates (next section); the October 26, 2026 committee packet still lists the allocations "as per 4Creeks July 10, 2026 Technical Memorandum", and the Groundwater Allocation page showed the water year 2026 block and nothing for 2027 on October 21, 2026. Resolution 2026-07 recites a combined Tier 1 and Tier 2 penalty allocation of 0.54 acre-feet per acre for water year 2027 on eligible land; the water year 2027 sustainable yield and precipitation figures were not posted as adopted as of October 21, 2026, so this page carries no water year 2027 allocation number beyond that recital. Check the GSA for the outcome; the next regular meeting is November 9, 2026.

The ramp-down (Rule 4.03(b)): transitional water, the Tier 1 and Tier 2 allocations together, is 70 percent of the 124,600 acre-foot average annual overdraft in water years 2026 to 2030, 40 percent in 2031 to 2035 and 20 percent in 2036 to 2040. There is no separate hard-cap number: no pumping beyond Tier 2 is allowed.

Carryover: native sustainable yield carries over on a five-year rolling basis; precipitation does not carry over; Tier 1 and Tier 2 carry over when the penalty rate is paid within 60 days of the start of the new water year or of annual invoicing, whichever is greater, and for at most five years. Carried-over native credits transfer inside the GSA on the GSA's form; Tier 1 and Tier 2 transfers reach no further than three zones and leave a percentage behind. Well registration is mandatory: the deadline was July 1, 2026, and Rule 2.01(c) allows a civil penalty of up to $1,000 plus $100 for each additional day.

The tiers and their prices

“Tier 1 Penalty Rate $150.00; Tier 2 Penalty Rate $250.00; Prohibited Tier Remains $500.00”

Three tiers, three prices: up to, per acre-foot of net use
No charge$150$250$500$2500.83SY0.31Tier 10.23Tier 2Tier 3No charge$150$250$500$2500.83SY0.31Tier 10.23Tier 2Tier 3
  • Sustainable yield0.83 AF per acre
  • Tier 1 and Tier 20.31 and 0.23 AF per acre, water year 2026 rates
  • Prohibited Tier 3Up to $500, and a cut in next year's Tier 1 and Tier 2
  • Water year 2027 ratesResolution 2026-07, adopted October 12, 2026

Acre-feet per acre of net use, left to right, in the order of debit. The precipitation allocation (3 to 11 inches by Township-Range-Section) is debited first and is not drawn.

Water year 2026 rates, set at the September 8, 2025 Board meeting: Tier 1 up to $150 per acre-foot, Tier 2 up to $250, Prohibited Tier 3 up to $500. The allocation page records the same three rates for water year 2024 (set November 13, 2023) and water year 2025 (set October 2, 2024). Tier 3 also deducts the volume consumed from the next year's Tier 1 and Tier 2 allocation (Rule 4.03(c)(iii)).

Order of debit (Rule 3.04): precipitation, then sustainable yield and credits, then Tier 1, then Tier 2, and Prohibited Tier 3 after every other available source of water is exhausted.

Rule text and sources10 sources

Water year 2027 rates, set by Resolution 2026-07 at the October 12, 2026 Board meeting on an 8 to 2 vote: Tier 1 up to $250 per acre-foot, Tier 2 up to $250, Tier 3 up to $500. Tier 1 rises from the $150 of water years 2024 to 2026; Tier 2 and Tier 3 are unchanged. The September 14, 2026 minutes record that the committees had recommended no change; the resolution instead sizes the rates to collect about $4.9 million for the domestic well program and the Land Fallowing Program if the full Tier 1 and Tier 2 allocation were pumped, and directs the General Manager to give notice under Rule 5.04. The Board asked the Stakeholder Committee to review the new rates. At the same meeting Resolution 2026-06 authorized up to $10 million of tier penalty revenue to buy supplemental surface water in water year 2027, with the stated aim of eliminating the Tier 1 and Tier 2 allocations, and rule amendments to be drafted before water year 2028. The allocation page had not been updated with the 2027 rates as of October 21, 2026.

Separate from the tiers: an annual land assessment the Board sets each fiscal year at a rate not to exceed $10 per acre; the June 2026 minutes note $6 per acre for the coming year.

Invoices, 60 days, then liens

“Current invoices direct payment within 60 days of receipt.”

From invoice to lien
  1. About five months after the water year endsAnnual invoice
  2. Within 60 daysPayment due (Rule 5.02)
  3. After 60 daysDelinquent: monthly notices, then a public hearing
  4. After the hearingCertificates of lien filed with the Tulare County Recorder

The water year 2024 cycle: notices from April 14, 2026, the hearing on June 8, 2026. Liens for water year 2025 were authorized on October 12, 2026.

Annual invoices for a water year go out about five months after it ends. For water year 2025, which ended September 30, 2025, staff reported in February 2026 that invoices were being finalized for issue in early March 2026. Rule 5.02 requires payment within 60 days of the invoice date.

Rule text and sources8 sources

What follows a missed payment, from the water year 2024 cycle: Resolution 2026-05 records that Tier balances were delinquent 60 days after the invoice showing them was sent; landowners with outstanding penalties were noticed beginning April 14, 2026 and monthly thereafter; the Board held a public hearing on June 8, 2026 and authorized staff to file Certificates of Lien with the Tulare County Recorder for the $1,265,880 listed in its Exhibit A.

Staff told the Board in July and August 2026 that the lien process for water year 2025 invoices would start sooner than in prior years and that future delinquent charges may move to the County tax roll. The Fifth Amended Rules state no late fee or interest rate; ask the GSA what applies to a late balance. The cycle repeated for water year 2025: on October 12, 2026 the Board held the hearing on delinquent Tier 1 and Tier 2 penalties and adopted the lien resolution on its agenda as Resolution 2026-08, authorizing staff to record certificates of lien.

Flowmeter or satellite: the election

“communicate an election to use flowmeters to the GKGSA by October 1 of each water year”

Billed on your flowmeter: what keeps the election
  1. By October 1Elect flowmeters, with the full meter documentation
  2. Within 30 days of each month endReport the quantity extracted at each parcel
  3. A late reportThe election is withdrawn: satellite ET for that period

Monthly reports of the quantity extracted at each parcel are due within 30 days of month end. A late report is deemed a withdrawal of the election, and the GSA falls back to the evapotranspiration data for that period. An owner may change the election after October 1 once a year, by request to the General Manager with Board approval. Metered accounting is net: gross groundwater pumped minus the GSA engineer's estimated return flow, calculated monthly within 60 days of month end. Wells constructed after August 15, 2022, the date the Rules were adopted, must have flowmeters.

Why it matters: a missed monthly report quietly withdraws the election and puts you back on the satellite number for that period. We keep records from connected meters and flag missing readings. The monthly sheet shows the records received; readings from telemetry meters are also sealed into our signed chain as they arrive. The election letter and reports stay with you or your adviser.

Rule text and sources3 sources

Rule 2.02 of the Fifth Amended Rules measures use, at the option of the owner or operator, from flowmeters connected to the well continuously for the preceding year, or from evapotranspiration information obtained via satellite technology. The owner must communicate a flowmeter election to the GSA by October 1 of each water year and provide the meter information: manufacturer and model, install date, pipe diameter and meter size, who installed and calibrated it per manufacturer specifications, inspection records on the manufacturer's schedule, photos showing adequate straight pipe before and after the meter, crop and irrigation details, and a map if there are several meters. The GSA may inspect the meter.

Satellite: the subbasin contracts with Land IQ for monthly evapotranspiration data at the field level, and landowners who create a Water Dashboard account see the same data the GSA uses to track allocations. At its August 10, 2026 meeting the Board heard that evapotranspiration remains the main methodology and discussed whether and when a transition to meters should occur.

Protests and appeals

“including the possibility of authorizing a separate methodology not identified in these Rules and Regulations”

The monthly usage number or the method (Rule 3.05(b)): written protest to the General Manager at the GSA's main office within 30 days of notification of net consumed groundwater use. The General Manager investigates and may bring a recommendation to the Board within 60 days; the Board acts within 60 days of receiving all relevant information, and may authorize a separate methodology.

The allocation (Rule 4.06(b)): written protest within 30 days of the date in the notice; Board action within 120 days of receiving all relevant information. A penalty (Rule 5.01(d) and (e)): written appeal to the General Manager within 30 days; the General Manager may ask for more evidence, and the Board may decide on the papers or hold a hearing. Individual appeals reach the Board agenda, as on September 14, 2026.

Rule text and sources3 sources

Data errors: the Water Dashboard lets landowners report a parcel boundary change, a discrepancy in assessed acreage or incorrect crop information.

The State

“designating the Kaweah Subbasin as probationary under SGMA is not necessary at this time”

The Kaweah Subbasin is not on State probation. On December 2, 2025 the State Water Resources Control Board adopted Resolution 2025-0040, finding that the subbasin's GSAs had addressed the deficiencies in the Department of Water Resources' inadequate determination, and returned the subbasin to DWR's jurisdiction. Greater Kaweah's December 3, 2025 release describes the decision as effectively retaining local control over groundwater management.

No State Water Board probationary designation applies to the Kaweah Subbasin as of October 21, 2026 (the Board's Kaweah page was last updated December 10, 2025). The estimator on this page prices Greater Kaweah's Tier 3 charge and excludes any State Water Board fee.

Sources (3)

What this means for a 500-acre orchard

500 acres, 6-inch precipitation allocation, net use of 1,000 acre-feetIllustration
Net consumptive use1,000 AF66515511565935Net consumptive use1,000 AF665155935
  • Covered at no charge, 500 x (0.5 + 0.83)665 AF
  • Tier 1, 155 x $150up to $23,250
  • Tier 2, 115 x $250up to $28,750
  • Prohibited Tier 3 above 935, 65 x $500up to $84,500 in all

At the water year 2026 rates. Precipitation varies by parcel; use your own Township-Range-Section figure. Unit math, not a claim about your orchard.

Take a parcel with a 6-inch precipitation allocation (0.5 acre-feet per acre). Covered at no charge: 500 × (0.5 + 0.83) = 665 acre-feet of net consumptive use. The next 500 × 0.31 = 155 acre-feet of Tier 1 cost up to 155 × $150 = $23,250; the next 500 × 0.23 = 115 acre-feet of Tier 2 cost up to 115 × $250 = $28,750. Net use above 935 acre-feet is Prohibited Tier 3 at up to $500 per acre-foot plus a deduction from next year's tiers. Net use of 1,000 acre-feet on this parcel would cost up to $23,250 + $28,750 + 65 × $500 = $84,500 at the water year 2026 rates. Precipitation varies by parcel; use your own Township-Range-Section figure. Unit math, not a claim about your orchard.

Rule text and sources2 sources

The estimator below prices the Tier 3 portion. Enter 1.37 plus your precipitation figure in acre-feet as the per-acre budget; the Tier 1 and Tier 2 charges inside that budget are not included in its total. Estimate only. Verify with Greater Kaweah GSA.

Free SGMA estimator

Use your GSA account, not a county average.

ESTIMATE ONLY. Verify with your GSA. This is not a bill, a compliance determination or an irrigation recommendation.

Water year 2026, October 1, 2025 to September 30, 2026. Enter, as the per-acre budget, your parcel's precipitation allocation in acre-feet (inches divided by 12) plus 0.83 sustainable yield plus 0.31 Tier 1 plus 0.23 Tier 2, which is 1.37 acre-feet per acre plus precipitation. Enter net consumptive use as the GSA accounts it (satellite evapotranspiration or metered net use), not gross pumping.

Rate source, checked 2026-10-21: https://greaterkaweahgsa.org/groundwater-allocation/

AF means acre-feet. Inputs stay in this page and are not submitted to a server. The estimator reuses the allocation and tier arithmetic behind our SGMA calculator.

Example selection. Confirm your parcel’s GSA.
Enter your eligible acres in place of the 500-acre example.
Use the same accounting basis as your GSA.
For this period and these acres. No assumed use.

Enter your acreage, GSA-approved budget and accounted use, then confirm the GSA and period. Blank does not mean zero.

Kaweah Subbasin GSA contacts

County lines are not GSA boundaries. These are public agency and shared agency websites, not a determination of parcel coverage. Basin partners may extend into neighboring counties. Open the official directory or map before choosing a rate. Checked 2026-10-21.

All GSAs in this subbasinKaweah Subbasin

Kaweah Subbasin

Greater Kaweah GSA office: 227 N West St., Visalia, CA 93291; info@greaterkaweahgsa.org. The Board meets the second Monday of each month at 1:00 p.m.; the next regular meeting is November 9, 2026. Water Dashboard accounts: gsawd.com. Board chair: Chris Tantau; vice chair: Stephen Johnson. The site lists no staff page; Mark Larsen is named as General Manager on the GSA's transfer form and its December 3, 2025 release.

Greater Kaweah GSA questions

Is 1.37 my whole allocation?

No. Add your parcel's precipitation allocation (3 to 11 inches, by Township-Range-Section), which is debited before anything else.

What do Tier 1 and Tier 2 cost in water year 2027?

Up to $250 per acre-foot for Tier 1 and up to $250 for Tier 2, with up to $500 beyond Tier 2, set by Resolution 2026-07 at the October 12, 2026 Board meeting; the October 26, 2026 committee packet carries the resolution and the meeting summary. Tier 1 is up from $150 in water year 2026. The allocation page still showed the water year 2026 block on October 21, 2026, so confirm the rate and your 2027 allocation with the GSA before budgeting.

Can I be billed on my flowmeter?

Yes, if you elect it by October 1 of the water year with the full meter documentation and report every month within 30 days; a missed report withdraws the election for that period. The election for water year 2027 was due October 1, 2026; a change after that date needs a request to the General Manager and Board approval, so confirm the next election period with the GSA.

What happens if I do not pay?

After 60 days the balance is delinquent; the GSA sends monthly notices, holds a hearing and records liens with the County Recorder, and is considering the county tax roll for future years. Liens for delinquent water year 2025 tier penalties were authorized on October 12, 2026.