Skip to main content
All guides
Fresno County / SGMA field guide

Start with the subbasin, not the county line.

A Westside almond orchard and a Kings Subbasin vineyard do not share a groundwater allocation just because both are in Fresno County. Keep groundwater, surface-water deliveries and land charges on separate lines.

Public sources checked . Confirm later changes with your GSA.

Westlands: groundwater is separate from the surface-water contract

500 eligible gross acres in an approved Westlands accountIllustration
Authorized groundwater500 AF0.60.4500 x 1.0 = 500 AFAuthorized groundwater500 AF0.60.4500 x 1.0 = 500 AF
  • Sustainable yield0.6 AF per acre
  • Transition0.4 AF per acre
  • Each acre-foot pumped above the authorized amountAdds $500

Before account-specific adjustments. The land-based SGMA component on these acres is $1,250. Replacement water and District costs are not priced.

For the 2026-27 district water year beginning March 1, 2026, the GSA FAQ lists 1.0 acre-foot per eligible gross acre for applicants: 0.6 sustainable yield plus 0.4 transition. This is not the CVP surface-water allocation.

The final application deadline was July 31, 2026. Confirm approval and your district account balance. Carryover, credits and subsidence-prone-area restrictions can affect what may actually be pumped at a well.

Sources (2)

The confirmed land-based SGMA charge

“Sustainable Groundwater Management Act”

Three separate lines, not one bill
  • $2.50 per acreLand-based SGMA charge, 2026-27; a land component
  • $500 per acre-footEach acre-foot pumped above the authorized amount
  • Replacement waterExcess over 25 acre-feet a year must be mitigated; not priced here
  • District costsReimbursed by the user; not priced here

The published 2026-27 Water Rates and Charges table, dated March 1, 2026, lists $2.50 per acre under land-based SGMA charges. This is a land component, not a per-acre-foot overuse price.

Pumping more than authorized: per the District's May 2026 FAQ (question 10), a groundwater user who pumps more than the authorized amount is subject to a fee of $500 per acre-foot. Excess pumping over 25 acre-feet per year must also be mitigated with replacement water, and the user reimburses the District's costs. Only the $500 per acre-foot component is a priced figure here; replacement water and District costs are not priced. Well-location service charges and other district fees are excluded.

Sources (2)

For a parcel outside Westlands

Start with the subbasin, not the county line
  • WestsideWestlands: the allocation and land charge on this page
  • KingsThe rules of its own GSA
  • Delta-MendotaThe rules of its own GSA
  • Pleasant ValleyThe rules of its own GSA

Fresno County includes Kings, Westside, Delta-Mendota and Pleasant Valley subbasins. Use the agency directory below to locate the correct plan and contact. Neither the Westlands allocation nor its land charge is a Fresno-wide rate.

Sources (1)

Permanent crops in Fresno County

Almonds, grapes and pistachios lead Fresno County's 2024 crop-value ranking. The report also identifies peaches among its leading commodities. Those are production rankings, not assumed irrigation requirements.

Sources (1)

Find your GSA

A 500-acre Westlands budget, with the $500 per acre-foot component

For an approved account with 500 eligible gross acres, the published allocation is 500 × 1.0 = 500 acre-feet before account-specific adjustments. At $2.50 per acre, the land-based SGMA component is $1,250.

That is not the total annual water bill. Per the District's May 2026 FAQ, each acre-foot pumped above the authorized amount adds $500 to the estimate. Above 25 acre-feet per year the excess must also be mitigated with replacement water, and the user reimburses the District's costs; neither is priced here. Enter your authorized groundwater budget and accounted pumping below to see the volume difference.

Sources (2)
Free SGMA estimator

Use your GSA account, not a county average.

ESTIMATE ONLY. Verify with your GSA. This is not a bill, a compliance determination or an irrigation recommendation.

2026-27 district water year, beginning March 1, 2026. Use eligible gross acres and district-authorized groundwater, including only credits approved for the well location. Do not add the CVP surface-water allocation. Each acre-foot pumped above the authorized amount is priced at $500 per the District May 2026 FAQ.

Rate source, checked 2026-10-20: https://wwd.ca.gov/wp-content/uploads/2026/05/gsp-faq-2026.pdf

AF means acre-feet. Inputs stay in this page and are not submitted to a server. The estimator reuses the allocation and tier arithmetic behind our SGMA calculator.

Example selection. Confirm your parcel’s GSA.
Enter your eligible acres in place of the 500-acre example.
Use the same accounting basis as your GSA.
For this period and these acres. No assumed use.

Enter your acreage, GSA-approved budget and accounted use, then confirm the GSA and period. Blank does not mean zero.

Fresno County subbasins and GSA contacts

County lines are not GSA boundaries. These are public agency and shared agency websites, not a determination of parcel coverage. Basin partners may extend into neighboring counties. Open the official directory or map before choosing a rate. Checked 2026-09-07.

All GSAs in this countyKings Subbasin, Westside Subbasin, Delta-Mendota Subbasin, Fresno County areas, Pleasant Valley Subbasin

Fresno County questions

Is the Westlands groundwater allocation my Fresno County surface-water allocation?

No. The GSA groundwater account and the CVP surface-water contract are separate. The district FAQ also limits where groundwater credits can be pumped.

Does the Westlands land-based SGMA charge include every water fee?

No. It is a land-based component only. The $500 per acre-foot fee for pumping more than authorized is a separate component, per the District's May 2026 FAQ. Replacement water, District cost reimbursement and other district charges are not priced in this estimate.

Can a Kings Subbasin grower use the Westlands estimator rate?

No. Westlands is in the Westside Subbasin. A Kings, Delta-Mendota or Pleasant Valley parcel needs the rules of its own GSA.

Bring the allocation statement. We'll work through the math.

A short conversation about your accounting basis, missing evidence and questions for the GSA. No assumed water savings. Or send us your GSA, acres, crop and how your water is measured for a free water position check.